Targets

Bridges – Washing – Inspection – PTI

16-10-2026
Bridge (2.5)
15.6%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (62)
50%
Target: 124
15-10-2026
Bridge (5)
31.3%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (139)
112.1%
Target: 124
14-10-2026
Bridge (3)
18.8%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (144)
116.1%
Target: 124
13-10-2026
Bridge (5)
31.3%
Target: 16
Washing (19)
126.7%
Target: 15
Inspection (21)
300%
Target: 7
PTI OK (159)
128.2%
Target: 124
12-10-2026
Bridge (3)
18.8%
Target: 16
Washing (15)
100%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (122)
98.4%
Target: 124
10-10-2026
Bridge (2.5)
15.6%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (93)
75%
Target: 124
09-10-2026
Bridge (6.5)
40.6%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (158)
127.4%
Target: 124
08-10-2026
Bridge (7.5)
46.9%
Target: 16
Washing (13)
86.7%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (111)
89.5%
Target: 124
07-10-2026
Bridge (6)
37.5%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (100)
80.6%
Target: 124
06-10-2026
Bridge (5)
31.3%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (81)
65.3%
Target: 124
05-10-2026
Bridge (7)
43.8%
Target: 16
Washing (12)
80%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (109)
87.9%
Target: 124
02-10-2026
Bridge (8.5)
53.1%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (131)
105.6%
Target: 124
01-10-2026
Bridge (6.5)
40.6%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (107)
86.3%
Target: 124
Week (18.5)
23.1%
Target: 80
Week (74)
98.7%
Target: 75
Week (92)
262.9%
Target: 35
Week (626)
101.3%
Target: 618
Month (68)
21.3%
Target: 320
Month (183)
61%
Target: 300
Month (202)
144.3%
Target: 140
Month (1516)
60.6%
Target: 2500