Targets

Bridges – Washing – Inspection – PTI

30-06-2026
Bridge (12.5)
78.1%
Target: 16
Washing (17)
113.3%
Target: 15
Inspection (21)
300%
Target: 7
PTI OK (176)
141.9%
Target: 124
29-06-2026
Bridge (9)
56.3%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (114)
91.9%
Target: 124
26-06-2026
Bridge (1.5)
9.4%
Target: 16
Washing (6)
40%
Target: 15
Inspection (1)
14.3%
Target: 7
PTI OK (15)
12.1%
Target: 124
25-06-2026
Bridge (7.5)
46.9%
Target: 16
Washing (19)
126.7%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (104)
83.9%
Target: 124
24-06-2026
Bridge (9)
56.3%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (130)
104.8%
Target: 124
23-06-2026
Bridge (10)
62.5%
Target: 16
Washing (17)
113.3%
Target: 15
Inspection (23)
328.6%
Target: 7
PTI OK (134)
108.1%
Target: 124
22-06-2026
Bridge (7)
43.8%
Target: 16
Washing (18)
120%
Target: 15
Inspection (16)
228.6%
Target: 7
PTI OK (107)
86.3%
Target: 124
20-06-2026
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (7)
100%
Target: 7
PTI OK (0)
0%
Target: 124
19-06-2026
Bridge (9)
56.3%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (23)
328.6%
Target: 7
PTI OK (141)
113.7%
Target: 124
18-06-2026
Bridge (7.5)
46.9%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (11)
157.1%
Target: 7
PTI OK (113)
91.1%
Target: 124
17-06-2026
Bridge (12)
75%
Target: 16
Washing (18)
120%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (176)
141.9%
Target: 124
16-06-2026
Bridge (13)
81.3%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (205)
165.3%
Target: 124
15-06-2026
Bridge (10)
62.5%
Target: 16
Washing (18)
120%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (140)
112.9%
Target: 124
13-06-2026
Bridge (7)
43.8%
Target: 16
Washing (8)
53.3%
Target: 15
Inspection (7)
100%
Target: 7
PTI OK (84)
67.7%
Target: 124
12-06-2026
Bridge (11.5)
71.9%
Target: 16
Washing (15)
100%
Target: 15
Inspection (12)
171.4%
Target: 7
PTI OK (190)
153.2%
Target: 124
11-06-2026
Bridge (13)
81.3%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (13)
185.7%
Target: 7
PTI OK (183)
147.6%
Target: 124
10-06-2026
Bridge (11.5)
71.9%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (172)
138.7%
Target: 124
09-06-2026
Bridge (15)
93.8%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (230)
185.5%
Target: 124
08-06-2026
Bridge (7)
43.8%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (22)
314.3%
Target: 7
PTI OK (114)
91.9%
Target: 124
06-06-2026
Bridge (3)
18.8%
Target: 16
Washing (6)
40%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (45)
36.3%
Target: 124
05-06-2026
Bridge (5.5)
34.4%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (16)
228.6%
Target: 7
PTI OK (85)
68.5%
Target: 124
04-06-2026
Bridge (10)
62.5%
Target: 16
Washing (13)
86.7%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (151)
121.8%
Target: 124
03-06-2026
Bridge (9)
56.3%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (20)
285.7%
Target: 7
PTI OK (139)
112.1%
Target: 124
02-06-2026
Bridge (11)
68.8%
Target: 16
Washing (17)
113.3%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (163)
131.5%
Target: 124
01-06-2026
Bridge (8.5)
53.1%
Target: 16
Washing (15)
100%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (124)
100%
Target: 124
Week (21)
26.3%
Target: 80
Week (62)
82.7%
Target: 75
Week (56)
160%
Target: 35
Week (572)
92.6%
Target: 618
Month (89)
27.8%
Target: 320
Month (245)
81.7%
Target: 300
Month (258)
184.3%
Target: 140
Month (2088)
83.5%
Target: 2500