Targets

Bridges – Washing – Inspection – PTI

30-09-2026
Bridge (8.5)
53.1%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (8)
114.3%
Target: 7
PTI OK (148)
119.4%
Target: 124
29-09-2026
Bridge (7)
43.8%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (21)
300%
Target: 7
PTI OK (112)
90.3%
Target: 124
28-09-2026
Bridge (8)
50%
Target: 16
Washing (18)
120%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (134)
108.1%
Target: 124
25-09-2026
Bridge (11)
68.8%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (12)
171.4%
Target: 7
PTI OK (179)
144.4%
Target: 124
24-09-2026
Bridge (8)
50%
Target: 16
Washing (9)
60%
Target: 15
Inspection (7)
100%
Target: 7
PTI OK (130)
104.8%
Target: 124
23-09-2026
Bridge (11)
68.8%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (10)
142.9%
Target: 7
PTI OK (183)
147.6%
Target: 124
22-09-2026
Bridge (9)
56.3%
Target: 16
Washing (17)
113.3%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (151)
121.8%
Target: 124
21-09-2026
Bridge (6.5)
40.6%
Target: 16
Washing (15)
100%
Target: 15
Inspection (12)
171.4%
Target: 7
PTI OK (95)
76.6%
Target: 124
19-09-2026
Bridge (0.5)
3.1%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (9)
7.3%
Target: 124
18-09-2026
Bridge (8)
50%
Target: 16
Washing (18)
120%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (134)
108.1%
Target: 124
17-09-2026
Bridge (8.5)
53.1%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (127)
102.4%
Target: 124
16-09-2026
Bridge (7.5)
46.9%
Target: 16
Washing (18)
120%
Target: 15
Inspection (20)
285.7%
Target: 7
PTI OK (124)
100%
Target: 124
15-09-2026
Bridge (6)
37.5%
Target: 16
Washing (19)
126.7%
Target: 15
Inspection (20)
285.7%
Target: 7
PTI OK (102)
82.3%
Target: 124
14-09-2026
Bridge (9)
56.3%
Target: 16
Washing (20)
133.3%
Target: 15
Inspection (21)
300%
Target: 7
PTI OK (138)
111.3%
Target: 124
12-09-2026
Bridge (0.5)
3.1%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (9)
7.3%
Target: 124
11-09-2026
Bridge (7.5)
46.9%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (13)
185.7%
Target: 7
PTI OK (119)
96%
Target: 124
10-09-2026
Bridge (5)
31.3%
Target: 16
Washing (11)
73.3%
Target: 15
Inspection (16)
228.6%
Target: 7
PTI OK (79)
63.7%
Target: 124
09-09-2026
Bridge (9)
56.3%
Target: 16
Washing (15)
100%
Target: 15
Inspection (16)
228.6%
Target: 7
PTI OK (142)
114.5%
Target: 124
08-09-2026
Bridge (10)
62.5%
Target: 16
Washing (19)
126.7%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (152)
122.6%
Target: 124
07-09-2026
Bridge (7)
43.8%
Target: 16
Washing (21)
140%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (113)
91.1%
Target: 124
04-09-2026
Bridge (8.5)
53.1%
Target: 16
Washing (5)
33.3%
Target: 15
Inspection (9)
128.6%
Target: 7
PTI OK (107)
86.3%
Target: 124
03-09-2026
Bridge (12)
75%
Target: 16
Washing (15)
100%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (137)
110.5%
Target: 124
02-09-2026
Bridge (10.5)
65.6%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (20)
285.7%
Target: 7
PTI OK (156)
125.8%
Target: 124
01-09-2026
Bridge (7)
43.8%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (105)
84.7%
Target: 124
Week (21)
26.3%
Target: 80
Week (62)
82.7%
Target: 75
Week (56)
160%
Target: 35
Week (572)
92.6%
Target: 618
Month (89)
27.8%
Target: 320
Month (245)
81.7%
Target: 300
Month (258)
184.3%
Target: 140
Month (2088)
83.5%
Target: 2500