Targets

Bridges – Washing – Inspection – PTI

30-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
27-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
26-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
25-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
24-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
23-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
20-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
19-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
18-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
17-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
16-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
13-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
12-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
11-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
10-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
09-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
06-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
05-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
04-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
03-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
02-09-2052
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
Week (15.5)
19.4%
Target: 80
Week (59)
78.7%
Target: 75
Week (65)
185.7%
Target: 35
Week (500)
80.9%
Target: 618
Month (15.5)
4.8%
Target: 320
Month (59)
19.7%
Target: 300
Month (65)
46.4%
Target: 140
Month (500)
20%
Target: 2500