Targets

Bridges – Washing – Inspection – PTI

28-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
27-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
26-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
25-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
24-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
21-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
20-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
19-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
18-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
17-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
14-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
13-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
12-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
11-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
10-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
07-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
06-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
05-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
04-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
03-02-2053
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
Week (15.5)
19.4%
Target: 80
Week (59)
78.7%
Target: 75
Week (68)
194.3%
Target: 35
Week (511)
82.7%
Target: 618
Month (15.5)
4.8%
Target: 320
Month (59)
19.7%
Target: 300
Month (68)
48.6%
Target: 140
Month (511)
20.4%
Target: 2500