Targets

Bridges – Washing – Inspection – PTI

31-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
30-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
29-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
26-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
25-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
24-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
23-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
22-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
19-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
18-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
17-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
16-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
15-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
12-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
11-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
10-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
09-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
08-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
05-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
04-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
03-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
02-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
01-12-2059
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
Week (24.5)
30.6%
Target: 80
Week (86)
114.7%
Target: 75
Week (103)
294.3%
Target: 35
Week (696)
112.6%
Target: 618
Month (24.5)
7.7%
Target: 320
Month (86)
28.7%
Target: 300
Month (103)
73.6%
Target: 140
Month (696)
27.8%
Target: 2500