Targets

Bridges – Washing – Inspection – PTI

31-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
28-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
27-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
26-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
25-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
24-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
21-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
20-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
19-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
18-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
17-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
14-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
13-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
12-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
11-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
10-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
07-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
06-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
05-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
04-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
03-03-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
Week (4.5)
5.6%
Target: 80
Week (16)
21.3%
Target: 75
Week (9)
25.7%
Target: 35
Week (159)
25.7%
Target: 618
Month (52.5)
16.4%
Target: 320
Month (175)
58.3%
Target: 300
Month (184)
131.4%
Target: 140
Month (1482)
59.3%
Target: 2500