Targets

Bridges – Washing – Inspection – PTI

30-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
29-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
28-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
27-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
26-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
23-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
22-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
21-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
20-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
19-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
16-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
15-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
14-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
13-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
12-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
09-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
08-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
07-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
06-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
05-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
02-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
01-05-2081
Bridge (0)
0%
Target: 16
Washing (0)
0%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (0)
0%
Target: 124
Week (4.5)
5.6%
Target: 80
Week (16)
21.3%
Target: 75
Week (9)
25.7%
Target: 35
Week (159)
25.7%
Target: 618
Month (52.5)
16.4%
Target: 320
Month (175)
58.3%
Target: 300
Month (184)
131.4%
Target: 140
Month (1482)
59.3%
Target: 2500