Targets

Bridges – Washing – Inspection – PTI

27-02-2026
Bridge (9)
56.3%
Target: 16
Washing (12)
80%
Target: 15
Inspection (12)
171.4%
Target: 7
PTI OK (131)
105.6%
Target: 124
26-02-2026
Bridge (8.5)
53.1%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (11)
157.1%
Target: 7
PTI OK (140)
112.9%
Target: 124
25-02-2026
Bridge (8.5)
53.1%
Target: 16
Washing (12)
80%
Target: 15
Inspection (20)
285.7%
Target: 7
PTI OK (132)
106.5%
Target: 124
24-02-2026
Bridge (9)
56.3%
Target: 16
Washing (12)
80%
Target: 15
Inspection (10)
142.9%
Target: 7
PTI OK (128)
103.2%
Target: 124
23-02-2026
Bridge (9)
56.3%
Target: 16
Washing (13)
86.7%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (135)
108.9%
Target: 124
21-02-2026
Bridge (3.5)
21.9%
Target: 16
Washing (4)
26.7%
Target: 15
Inspection (0)
0%
Target: 7
PTI OK (52)
41.9%
Target: 124
20-02-2026
Bridge (8.5)
53.1%
Target: 16
Washing (12)
80%
Target: 15
Inspection (12)
171.4%
Target: 7
PTI OK (131)
105.6%
Target: 124
19-02-2026
Bridge (8)
50%
Target: 16
Washing (11)
73.3%
Target: 15
Inspection (10)
142.9%
Target: 7
PTI OK (113)
91.1%
Target: 124
18-02-2026
Bridge (6.5)
40.6%
Target: 16
Washing (9)
60%
Target: 15
Inspection (20)
285.7%
Target: 7
PTI OK (92)
74.2%
Target: 124
17-02-2026
Bridge (3)
18.8%
Target: 16
Washing (12)
80%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (88)
71%
Target: 124
16-02-2026
Bridge (10)
62.5%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (24)
342.9%
Target: 7
PTI OK (225)
181.5%
Target: 124
13-02-2026
Bridge (7)
43.8%
Target: 16
Washing (9)
60%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (136)
109.7%
Target: 124
12-02-2026
Bridge (5.5)
34.4%
Target: 16
Washing (12)
80%
Target: 15
Inspection (13)
185.7%
Target: 7
PTI OK (136)
109.7%
Target: 124
11-02-2026
Bridge (10)
62.5%
Target: 16
Washing (12)
80%
Target: 15
Inspection (9)
128.6%
Target: 7
PTI OK (62)
50%
Target: 124
10-02-2026
Bridge (9.5)
59.4%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (139)
112.1%
Target: 124
09-02-2026
Bridge (6)
37.5%
Target: 16
Washing (8)
53.3%
Target: 15
Inspection (26)
371.4%
Target: 7
PTI OK (80)
64.5%
Target: 124
06-02-2026
Bridge (3)
18.8%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (75)
60.5%
Target: 124
05-02-2026
Bridge (8)
50%
Target: 16
Washing (12)
80%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (139)
112.1%
Target: 124
04-02-2026
Bridge (5.5)
34.4%
Target: 16
Washing (5)
33.3%
Target: 15
Inspection (10)
142.9%
Target: 7
PTI OK (141)
113.7%
Target: 124
03-02-2026
Bridge (7)
43.8%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (13)
185.7%
Target: 7
PTI OK (0)
0%
Target: 124
02-02-2026
Bridge (7)
43.8%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (0)
0%
Target: 124
Week (21)
26.3%
Target: 80
Week (62)
82.7%
Target: 75
Week (56)
160%
Target: 35
Week (572)
92.6%
Target: 618
Month (89)
27.8%
Target: 320
Month (245)
81.7%
Target: 300
Month (258)
184.3%
Target: 140
Month (2088)
83.5%
Target: 2500