Targets

Bridges – Washing – Inspection – PTI

31-03-2026
Bridge (7.5)
46.9%
Target: 16
Washing (13)
86.7%
Target: 15
Inspection (24)
342.9%
Target: 7
PTI OK (111)
89.5%
Target: 124
30-03-2026
Bridge (5.5)
34.4%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (83)
66.9%
Target: 124
27-03-2026
Bridge (6)
37.5%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (11)
157.1%
Target: 7
PTI OK (97)
78.2%
Target: 124
26-03-2026
Bridge (8)
50%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (114)
91.9%
Target: 124
25-03-2026
Bridge (9)
56.3%
Target: 16
Washing (8)
53.3%
Target: 15
Inspection (11)
157.1%
Target: 7
PTI OK (156)
125.8%
Target: 124
24-03-2026
Bridge (6)
37.5%
Target: 16
Washing (11)
73.3%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (93)
75%
Target: 124
23-03-2026
Bridge (5.5)
34.4%
Target: 16
Washing (12)
80%
Target: 15
Inspection (24)
342.9%
Target: 7
PTI OK (83)
66.9%
Target: 124
20-03-2026
Bridge (5)
31.3%
Target: 16
Washing (11)
73.3%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (76)
61.3%
Target: 124
19-03-2026
Bridge (8.5)
53.1%
Target: 16
Washing (18)
120%
Target: 15
Inspection (12)
171.4%
Target: 7
PTI OK (132)
106.5%
Target: 124
18-03-2026
Bridge (8.5)
53.1%
Target: 16
Washing (16)
106.7%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (133)
107.3%
Target: 124
17-03-2026
Bridge (10)
62.5%
Target: 16
Washing (17)
113.3%
Target: 15
Inspection (23)
328.6%
Target: 7
PTI OK (156)
125.8%
Target: 124
16-03-2026
Bridge (5)
31.3%
Target: 16
Washing (13)
86.7%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (71)
57.3%
Target: 124
13-03-2026
Bridge (6)
37.5%
Target: 16
Washing (8)
53.3%
Target: 15
Inspection (25)
357.1%
Target: 7
PTI OK (90)
72.6%
Target: 124
12-03-2026
Bridge (7)
43.8%
Target: 16
Washing (10)
66.7%
Target: 15
Inspection (34)
485.7%
Target: 7
PTI OK (104)
83.9%
Target: 124
11-03-2026
Bridge (10)
62.5%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (148)
119.4%
Target: 124
10-03-2026
Bridge (9)
56.3%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (14)
200%
Target: 7
PTI OK (141)
113.7%
Target: 124
09-03-2026
Bridge (7.5)
46.9%
Target: 16
Washing (17)
113.3%
Target: 15
Inspection (15)
214.3%
Target: 7
PTI OK (110)
88.7%
Target: 124
06-03-2026
Bridge (7.5)
46.9%
Target: 16
Washing (8)
53.3%
Target: 15
Inspection (17)
242.9%
Target: 7
PTI OK (93)
75%
Target: 124
05-03-2026
Bridge (7)
43.8%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (18)
257.1%
Target: 7
PTI OK (99)
79.8%
Target: 124
04-03-2026
Bridge (5.5)
34.4%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (21)
300%
Target: 7
PTI OK (74)
59.7%
Target: 124
03-03-2026
Bridge (3)
18.8%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (19)
271.4%
Target: 7
PTI OK (38)
30.6%
Target: 124
02-03-2026
Bridge (3)
18.8%
Target: 16
Washing (14)
93.3%
Target: 15
Inspection (31)
442.9%
Target: 7
PTI OK (45)
36.3%
Target: 124
Week (21)
26.3%
Target: 80
Week (62)
82.7%
Target: 75
Week (56)
160%
Target: 35
Week (572)
92.6%
Target: 618
Month (89)
27.8%
Target: 320
Month (245)
81.7%
Target: 300
Month (258)
184.3%
Target: 140
Month (2088)
83.5%
Target: 2500