Targets
Bridges – Washing – Inspection – PTI
Daily Targets
|
30-04-2026
Bridge
(8)
50%
Target: 16
Washing
(17)
113.3%
Target: 15
Inspection
(15)
214.3%
Target: 7
PTI OK
(112)
90.3%
Target: 124
|
|
|
29-04-2026
Bridge
(6)
37.5%
Target: 16
Washing
(12)
80%
Target: 15
Inspection
(19)
271.4%
Target: 7
PTI OK
(84)
67.7%
Target: 124
|
|
|
28-04-2026
Bridge
(7.5)
46.9%
Target: 16
Washing
(10)
66.7%
Target: 15
Inspection
(11)
157.1%
Target: 7
PTI OK
(100)
80.6%
Target: 124
|
|
|
27-04-2026
Bridge
(0)
0%
Target: 16
Washing
(0)
0%
Target: 15
Inspection
(0)
0%
Target: 7
PTI OK
(0)
0%
Target: 124
|
|
|
25-04-2026
Bridge
(8.5)
53.1%
Target: 16
Washing
(13)
86.7%
Target: 15
Inspection
(12)
171.4%
Target: 7
PTI OK
(126)
101.6%
Target: 124
|
|
|
24-04-2026
Bridge
(10)
62.5%
Target: 16
Washing
(16)
106.7%
Target: 15
Inspection
(22)
314.3%
Target: 7
PTI OK
(157)
126.6%
Target: 124
|
|
|
23-04-2026
Bridge
(9)
56.3%
Target: 16
Washing
(16)
106.7%
Target: 15
Inspection
(14)
200%
Target: 7
PTI OK
(141)
113.7%
Target: 124
|
|
|
22-04-2026
Bridge
(9)
56.3%
Target: 16
Washing
(18)
120%
Target: 15
Inspection
(27)
385.7%
Target: 7
PTI OK
(131)
105.6%
Target: 124
|
|
|
21-04-2026
Bridge
(9)
56.3%
Target: 16
Washing
(13)
86.7%
Target: 15
Inspection
(21)
300%
Target: 7
PTI OK
(126)
101.6%
Target: 124
|
|
|
20-04-2026
Bridge
(9)
56.3%
Target: 16
Washing
(17)
113.3%
Target: 15
Inspection
(20)
285.7%
Target: 7
PTI OK
(141)
113.7%
Target: 124
|
|
|
18-04-2026
Bridge
(10)
62.5%
Target: 16
Washing
(13)
86.7%
Target: 15
Inspection
(13)
185.7%
Target: 7
PTI OK
(141)
113.7%
Target: 124
|
|
|
17-04-2026
Bridge
(9)
56.3%
Target: 16
Washing
(16)
106.7%
Target: 15
Inspection
(30)
428.6%
Target: 7
PTI OK
(139)
112.1%
Target: 124
|
|
|
16-04-2026
Bridge
(9)
56.3%
Target: 16
Washing
(14)
93.3%
Target: 15
Inspection
(24)
342.9%
Target: 7
PTI OK
(140)
112.9%
Target: 124
|
|
|
15-04-2026
Bridge
(11)
68.8%
Target: 16
Washing
(18)
120%
Target: 15
Inspection
(19)
271.4%
Target: 7
PTI OK
(165)
133.1%
Target: 124
|
|
|
14-04-2026
Bridge
(3.5)
21.9%
Target: 16
Washing
(22)
146.7%
Target: 15
Inspection
(17)
242.9%
Target: 7
PTI OK
(71)
57.3%
Target: 124
|
|
|
13-04-2026
Bridge
(11.5)
71.9%
Target: 16
Washing
(17)
113.3%
Target: 15
Inspection
(19)
271.4%
Target: 7
PTI OK
(190)
153.2%
Target: 124
|
|
|
11-04-2026
Bridge
(13.5)
84.4%
Target: 16
Washing
(13)
86.7%
Target: 15
Inspection
(3)
42.9%
Target: 7
PTI OK
(190)
153.2%
Target: 124
|
|
|
10-04-2026
Bridge
(12.5)
78.1%
Target: 16
Washing
(14)
93.3%
Target: 15
Inspection
(14)
200%
Target: 7
PTI OK
(192)
154.8%
Target: 124
|
|
|
09-04-2026
Bridge
(8.5)
53.1%
Target: 16
Washing
(13)
86.7%
Target: 15
Inspection
(29)
414.3%
Target: 7
PTI OK
(127)
102.4%
Target: 124
|
|
|
08-04-2026
Bridge
(8)
50%
Target: 16
Washing
(14)
93.3%
Target: 15
Inspection
(10)
142.9%
Target: 7
PTI OK
(111)
89.5%
Target: 124
|
|
|
07-04-2026
Bridge
(8.5)
53.1%
Target: 16
Washing
(14)
93.3%
Target: 15
Inspection
(14)
200%
Target: 7
PTI OK
(126)
101.6%
Target: 124
|
|
|
06-04-2026
Bridge
(0)
0%
Target: 16
Washing
(0)
0%
Target: 15
Inspection
(0)
0%
Target: 7
PTI OK
(0)
0%
Target: 124
|
|
|
03-04-2026
Bridge
(10)
62.5%
Target: 16
Washing
(12)
80%
Target: 15
Inspection
(13)
185.7%
Target: 7
PTI OK
(156)
125.8%
Target: 124
|
|
|
02-04-2026
Bridge
(12)
75%
Target: 16
Washing
(12)
80%
Target: 15
Inspection
(20)
285.7%
Target: 7
PTI OK
(173)
139.5%
Target: 124
|
|
|
01-04-2026
Bridge
(8.5)
53.1%
Target: 16
Washing
(12)
80%
Target: 15
Inspection
(17)
242.9%
Target: 7
PTI OK
(133)
107.3%
Target: 124
|
This Week Target
Week (21)
26.3%
Target: 80
|
Week (62)
82.7%
Target: 75
|
Week (56)
160%
Target: 35
|
Week (572)
92.6%
Target: 618
|
This Month Target
|
Month (89)
27.8%
Target: 320
|
Month (245)
81.7%
Target: 300
|
Month (258)
184.3%
Target: 140
|
Month (2088)
83.5%
Target: 2500
|